Weeks 282-285
10 June 2018Four weeks to write about.
Since returning from holiday, existing projects have motored forward, and a notable large one has emerged to take me through to the autumn.
First, my own work – Longcrag prototypes arrived, and I assembled them and flashed them. Excitingly, they worked entirely first time. So that’s really positive: no bugs on the software, no bugs on the hardware. The only question now is to refine the BOM, address any oversights in the hardware, and prototype a front panel. Then I have to consider if I want to manufacture the object.
I spoke to Emma about decomissioning our art project – we came up with a process we’re happy with.
I fettled some issues that emerged on Selside, dealing with feedback, and looking into moving it into production infrastructure. It appears to have continued to be a useful tool, so I’m pleased with that.
Selworthy motors as ever. I wrapped work on a feature that’s had me deep in Hex Fiend and building an internal library, which ended up using Braid to manage the dependency, and that turned out to be a tool I’ll use again in future.
Finally, a new project emerges: it’s called Lambrigg, and it’s a longer project with Sensible Object. It’s going to be several months of R&D in a space that combines lots of my interests and expertise – games, toys, interaction design, connected objects, embedded hardware. As an R&D project, I’m going to have to be fairly obtuse about it here, but it’s going to be a good few months of work, hopefully going from exploration through to prototyping. I’m excited.
And that means I’m pretty busy for the next few months, in lots of nice spaces: a little web and software work on Selworthy, my own music/electronics projects, and my main focus on Lambrigg for a few months. Good stuff.